My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:37:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, JANUARY 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />B) Drilling <br />Grouting of missed (non -void) confirmatory drill holes was performed at Underground Working <br />#4000. A grout pump and laborers were used to place bentonite grout into the "miss" drill holes. <br />Confirmatory drilling was performed at Underground Working #4001. A drill pattern was set out by <br />an AMEC field representative. Five holes were drilled encountering no voids. An approximate total <br />of 250 lineal feet was drilled. As -built survey of the drill holes was performed by Ames. Drilling <br />activities will be temporarily paused due to drilling priorities. <br />Confirmatory drilling was performed at Underground Working #4006. A drill pattern was set out by <br />an AMEC field representative. Forty holes were drilled encountering sixteen voids. An <br />approximate total of 2,000 lineal feet was drilled. As -built survey of the drill holes was performed <br />by Ames. <br />Grouting of missed (non -void) confirmatory drill holes was performed at Underground Working <br />#4006. A grout pump and laborers were used to place bentonite grout into the "miss" drill holes. <br />Confirmatory drilling was performed at Underground Working #4025. A drill pattern was set out by <br />an AMEC field representative. Four holes were drilled encountering no voids. An approximate <br />total of 2,000 lineal feet was drilled. As -built survey of the drill holes was performed by Ames. <br />C) Remediation <br />Underground Working #4014 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The previously logged location was staked by the <br />Ames surveyor. Excavation of the area was performed and it was found to be a shallow surface <br />working. The native material below the surface depression was found to be consistent and no <br />signs of a significant working were found. Backfilling of the working will be performed at a later <br />date. The area was bermed off for safety. <br />Underground Working #4016 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. A stope /adit was found and the excavator was used <br />to clean out the working. The working is no clean and now other workings were encountered <br />during the investigation. The working will be backfilled as structural fill placement progresses in <br />the area. <br />Underground Working #4017 was investigated using a Hitachi 350 excavator and observation <br />was performed by an AMEC field representative. The previously logged location was staked by <br />the Ames surveyor. Excavation of the area was performed and it was found to be a shallow <br />surface working. The native material below the surface depression was found to be consistent <br />and no signs of a significant working were found. Backfilling of the working will be performed at a <br />later date. The area was bermed off for safety. <br />Underground Working #4018 was investigated using a Hitachi 350 excavator and observation <br />was performed by an AMEC field representative. The previously logged location was staked by <br />the Ames surveyor. Excavation of the area was performed and it was found to be a shallow <br />surface working. The native material below the surface depression was found to be consistent <br />and no signs of a significant working were found. Backfilling of the working will be performed at a <br />later date. The area was bermed off for safety. <br />Underground Working #4019 was investigated using a Hitachi 350 excavator and observation <br />was performed by an AMEC field representative. The previously logged location was staked by <br />MEW Weekly Report WE 01.14.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.