L "=I I= <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: January 7, 2012 <br />Reporting Period: 1/1/2012 through 1/712012 <br />Days <br />S <br />I M <br />I T <br />I W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />- <br />N <br />N <br />N <br />N <br />- <br />D = Day Shift <br />N = <br />Night Shift <br />Project No.: 84201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day /Night <br />Ambient Temperature Range (F): Low: 22 °F to 30 °F ( + / -) High: 41 °F to 50 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />Ames: Work activities resumed Monday January 2, 2012 after observance of the Christmas and New <br />Year holidays. Night shift began Tuesday January 3, 2012 processing of DCF material for the Mill Site <br />Earthworks project. Seedmasters mobilized to site Tuesday January 3, 2012 to perform clear and grub <br />activities. Frontier Environmental Services Inc. mobilized to site Tuesday January 3, 2012 to relocated <br />the structure at Underground Working #4008 (Morning Glory). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Topsoil Stripping <br />Topsoil stripping within the Mill Site Earthworks project was performed using various CAT dozers <br />pushing the material into temporary stockpiles. The temporary stockpiles will be hauled to a <br />stockpile designated by CC &V at a later date. <br />B) Clear and Grub <br />Clear and grub activities were performed by Seedmasters for the Mill Site Earthworks project. A <br />Hitachi 160 excavator, a John Deere 135 excavator, and a CAT D -6 dozer were used to removing <br />trees and shrubs from the area. These trees and shrubs will be hauled to the topsoil stockpile <br />area designated by CC &V and will be chipped and mixed into the topsoil as it is placed. <br />C) Subgrade Preparation <br />Subgrade preparation was performed prior to structural fill placement in the areas shown on <br />Figure 1. Various CAT dozers were used to rip the existing surface to a depth of at least 6 inches. <br />Moisture conditioning of the subgrade was performed (when necessary) using a tandem axle <br />water truck. Compaction was performed using a 10 -ton vibratory smooth drum compactor passing <br />over the entire subgrade surface at least four times. The subgrade was inspected and approved <br />by an AMEC field representative, prior to fill placement. <br />MEW Weekly Report WE 01.07.2012 <br />