Laserfiche WebLink
WTI I m, <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />DEC 4 <br />DEC 5 <br />DEC 6 <br />DEC 7 <br />DEC 8 <br />DEC 9 <br />DEC 10 <br />Joseph Hickey <br />- <br />- <br />- <br />PR <br />PR <br />PR <br />- <br />Bill Erickson <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ben Melly- <br />- <br />- <br />- <br />- <br />- <br />- <br />Steve Rice <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Uwe Kelley <br />- <br />- <br />- <br />- <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Kim Morrison <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 12.10.2011 <br />