My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:33:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT DECEMBER 2011
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'"W_1 I MA-6 <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed stripping of topsoil within the topsoil stockpile area designated by CC &V. <br />AMEC observed relocation of the Dump 4 SLF stockpile. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue relocation of the existing SLF stockpile <br />Begin stripping topsoil for the Mill Site Earthworks project. <br />Continue clear and grub activities for the Mill Site Earthworks project. <br />Begin subgrade preparation for fill placement for the Mill Site Earthworks project. <br />Begin structural fill placement for the Mill Site Earthworks project. <br />Begin confirmatory drilling of Underground Workings for the Mill Site Earthworks project. <br />Begin investigation and remediation of Underground Workings for the Mill Site Earthworks project. <br />Begin structure removal for the Mill Site Earthworks project. <br />Summary of Non - conformances: <br />None Issued <br />MEW Weekly Report WE 12.10.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.