My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:33:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT DECEMBER 2011
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"11 =AM <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: December 10, 2011 <br />Reporting Period: 12/7111 through 12/10111 <br />Days <br />S <br />I M <br />T <br />I W <br />I T <br />F <br />S <br />Work Shifts <br />- <br />- <br />- <br />D <br />D <br />D <br />- <br />D = Day Shift <br />N = <br />Night Shift <br />Project No.: 84201125KO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />RECEIVED <br />AUG 2111 2012 <br />Division of Reclamation, <br />Mining & Safety <br />Ambient Temperature Range (F): Low: 14 °F to 20 °F ( + / -) High: 30 °F to 39 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />Ames: Construction activities for the Mill Site Earthworks project began Wednesday December 7,2011. <br />This will be the first weekly report submitted for the project. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Topsoil Stripping <br />Stripping of the stockpile area designated by CC &V was performed, providing an area to place <br />topsoil removed from within the Mill Site footprint. This was performed using various CAT dozers. <br />B) Clear and Grub <br />Any trees or shrubs within the area of topsoil stripping were moved to an area to be processed by <br />Seed Masters when they mobilize and begin clear and grub activities. The trees and shrubs will <br />be chipped and mixed into the topsoil stockpile designated by CC &V. <br />C) Subgrade Preparation <br />No work performed during the week. <br />D) Structural Fill Placement <br />No work performed during the week. <br />E) Slope Contouring <br />No work performed during the week. <br />F) Soil Liner Fill (SLF) <br />Relocation of the previously processed soil liner fill stockpile near Dump 4 began, moving it <br />outside of the Mill Site footprint using various CAT dozers. <br />MEW Weekly Report WE 12.10.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.