Laserfiche WebLink
Total acres <br />backfilled: <br />.6740 <br />Total acres <br />seeded w/ <br />approved mix: <br />D <br />13t`,,,,,,w <br />Total acres <br />/topsoil <br />replaced: <br />yi ort, <br />Total acres <br />mulched w/ <br />approved mulch: <br />non e- <br />Total acres <br />graded: <br />,D74(o <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />ry,rte, <br />`•It -"� <br />Topsoil <br />replacement <br />depth (in.): <br />npr l� <br />Mulch application <br />rate (tons /ac): <br />n/C <br />Seed <br />application <br />method: <br />(a ra vr\ b r L <br />.4- ho he broodCOStapplication <br />Fertilizer <br />method: <br />f10AP... Co. w re oct <br />Mulch <br />application <br />method: <br />n /C l <br />Permittee Name: <br />Urie Rock Company <br />Permit Number: <br />M- 2009 -038 <br />Operation Name: <br />Urie Gravel Pit <br />County: <br />Rio Blanco <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />August 21, 2012 <br />Permit Acreage: <br />30.48 <br />Current Bond Amt: <br />$91,600.00 <br />112c Annual Report - rtkih <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement ac Rr . <br />CSI v/ <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). iYES) NO <br />YES) NO <br />YES <br />AU G 222 <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)Pivisi 0 1? <br />Atk 4g Oeci a m$tIon <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is comp <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />(D - - Pr u, a kc.. Pv o r t � u ( . ) t C) \J (., . <br />CO WC_ Lox(. t1 ,L v14 1 Tt.� y !+ C r k� (1 t e° r s . <br />r(i (1: <br />9. Number of acres that were reclaimed during the current repo <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />31(3j2012 r f ) <br />YES <br />YES <br />Page 2 of 3 <br />NO <br />3,025 <br />c <br />• O74Lo Qc re.-5 <br />2. kw) <br />Y)011 ((.GK ) <br />