My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-03-14_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2001-03-14_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 7:26:36 AM
Creation date
8/28/2012 1:46:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
3/14/2001
Doc Name
Stipulations for Approval
From
DMG-Allen
To
DMG- Wally
Type & Sequence
TR25
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br /> 999 <br /> 5TATE OF COLOMDO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 D I V I S I O NA O F <br /> LSNERPhone.(303)866-3567 M I FAX:(303)832-8106 <br /> GEOLOGY <br /> RECLAMATION <br /> DATE: March 14, 2001 <br /> MINING-SAFETY-'TO: Wallace Erickson G Owens <br /> Governor <br /> Greg E.Watcher <br /> FROM: Allen Sorenson Executive Director <br /> 444 Michael B Long <br /> Division Director <br /> RE: Stipulations for Approval,Sunnyside Gold Corporation,Sunnyside Mine, <br /> Technica Revision TR-0?5,Permit No.M-1977-378 <br /> Stipulation No. 1 <br /> The degree of irregularity of the blasted surface of the tunnels through the reach of the proposed concrete <br /> bulkheads, after the scaling and washing operations,must be quantified and shown to be sufficient to <br /> prevent shear failure along the concrete-rock interface under the applied hydraulic thrust and in accordance <br /> with the design criteria for irregularity specified in the TR-025 application. <br /> Stipulation No. 2 <br /> The Division of Minerals and Geology will require that a copy of all documents related to technical revision <br /> TR-025 be placed on permanent file (recorded) with the San Jaun County Clerk and Recorder and that <br /> Sunnyside Gold provide an affidavit or receipt indicating the date on which the documents were placed with <br /> the county clerk and recorder. A permanent filing is deemed necessary in the case that any activity that may <br /> take place in the area in the distant future may require reference to the plans and designs for the bulkheads, <br /> and a filing with the county clerk is seen as the best way to ensure that the information will be available. <br /> Stipulation No. 3 <br /> American Tunnel Bulkhead No. 2 will be provided with a sampling port that will allow measurement of <br /> hydrostatic pressure behind the bulkhead and will allow samples of the impounded water to be collected <br /> for analysis. Bulkhead No. 2 will remain accessible for inspection and monitoring until it can be <br /> demonstrated that the bulkhead's performance is acceptable. The demonstration of acceptable <br /> performance must include, but may not be limited to: <br /> • Engineer's construction report and certification that the bulkhead was installed in accordance with <br /> the approved design and specifications. The construction report will include documentation of <br /> pertinent observations during construction, listing of the results of quality control and quality <br /> assurance tests, and a discussion of any problems encountered during construction and their <br />
The URL can be used to link to this page
Your browser does not support the video tag.