My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-12_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2001-02-12_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2021 8:41:18 AM
Creation date
8/28/2012 1:46:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
2/12/2001
Doc Name
Submittal
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR25
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S 'll'I'lll <br /> t� + 91II'111'I <br /> i 99 I <br /> "@C@ived <br /> 1-68 <br /> S=ti1 NYSIDE GOLD CORPORAVON 12 200' <br /> AN ECHO 2"COMPANY �p;V/S,D�ran90 Fj <br /> P.O. Box 177 • Silverton, CO 81433 l% n Of <br /> 4finera� ff,- <br /> O <br /> ce <br /> Phone (970) 387-5533 • Fax (970) 387-5310 &Geology <br /> r, <br /> February 08, 2001 Pi' <br /> Mr. Wally Erickson, Reclamation Specialist sr ����%'>\ ' <br /> Division of Minerals and Geology <br /> Department of Natural Resources <br /> 701 Camino del Rio, Room 125 G S-L> <br /> Durango, CO 81301 `� <br /> RE: File No. M-77-378, San Juan County �149 �o <br /> American Tunnel Closure Bulkheads °r ?� <br /> TR-15 Sub_ min 1 / %�ieIt �! <br /> 1/ o/s�ii <br /> a <br /> Dear Mr. Erickson: <br /> Sunnyside Gold Corporation(SGC) installed a bulkhead in the American Tunnel (first <br /> stage of the Sunnyside Mine final closure and reclamation plan) to eliminate drainage <br /> through the tunnel to surface from the Sunnyside Mine JR-14). This bulkhead is located <br /> approximately 8000' from the portal(SGC's property line) and has been in service since <br /> 1996 when the valve on the drainage pipe through the bulkhead was closed and drainage <br /> from the Sunnyside Mine was contained within the Sunnyside Mine workings. SGC has <br /> continued to treat water entering the American Tunnel downstream of the bulkhead (Gold <br /> King property) according to the terms of TR-14, SGC's discharge permit and the related <br /> voluntary Consent Decree agreement with CDPBE-WQCD. <br /> The Consent Decree agreement provides the framework for settlement of issues with <br /> WQCD related to the elimination of drainage from the American Tunnel and Terry <br /> Tunnel which TR-14, in part, addresses. TR-14 does not provide (DMG) approval of the <br /> design and placement of the additional bulkheads needed to complete the closure of the <br /> American Tunnel and eliminate drainage to surface through the tunnel. TR-14 was phase <br /> 1 of the closure process for the American Tunnel and Terry Tunnel. <br /> SGC believes that phase 1 has been completed with establishment of mine pool physical <br /> equilibrium and has implemented phase 2 of the closure process for the Terry Tunnel <br /> (TR-22). This application(TR-25) is submitted for DMG approval of phase 2 of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.