Laserfiche WebLink
Sunnyside Gold Corporation-Sunnyside Gold Mine-File No. M-77-378 <br /> Stipulation No. 5 REFER TO STIPULATION NO. 4: S.S.G.C. EVALUATION OF THE <br /> WASTE ROCK SHALL BE SUBMITTED TO THE MLRD AS A <br /> TECHNICAL REVISION (TR) REQUIRING APPROVAL PRIOR TO <br /> DISPOSAL OF ANY WASTE ROCK. <br /> Stipulation No. 6 SUNNYSIDE GOLD CORPORATION HAS COMMITTED A GEOTECHNICAL <br /> STABILITY ANALYSIS TO NUMERICALLY ASSESS THE FACTOR OF <br /> SAFETY ASSOCIATED WITH THE PIT WALL DESIGN BASED ON <br /> DETAILED SITE MAPPING OF GEOLOGIC STRUCTURE AND ROCK <br /> TEXTURE BY A "HIGHLY QUALIFIED PROFESSIONAL STRUCTURAL <br /> GEOLOGIST" ONCE THE INITIAL BENCHES ARE EXCAVATED AND <br /> SUBSEQUENT "GOOD EXPOSURE" IS ACHIEVED: ADDITIONALLY, <br /> AN ASSESSMENT OF THE PROJECTED IMPACTS THE OPEN PIT <br /> WILL HAVE AN ADJACENT, CURRENTLY UNAFFECTED SLOPES WILL <br /> BE EVALUATED. <br /> Stipulation No. 7 REFER TO STIPULATION NO. 6: THE MLRD WOULD LIKE TO <br /> FURTHER SPECIFY THAT THE GEOTECHNICAL ANALYSIS <br /> EVALUATION INCLUDE A DEMONSTRATION THAT THE MINING <br /> OPERATION WILL MAINTAIN COMPLIANCE WITH THE FOLLOWING <br /> PERFORMANCE STANDARDS: C.R.S. 34-32(1 )(H)(I)(J) . <br /> Stipulation No. 8 REFER TO STIPULATION NOS. 6 AND 7: EVALUATION OF THE <br /> GEOTECHNICAL ANALYSIS SHALL BE SUBMITTED AS A TECHNICAL <br /> REVISION PRIOR TO THE EXCAVATION OF THE THIRD MINE <br /> BENCH. IF RESULTS SHOW THAT MODIFICATIONS TO THE <br /> CURRENT DESIGNS ARE REQUIRED TO ENSURE STABILIZATION, <br /> THE MODELS WILL BE SUBMITTED AS A TECHNICAL REVISION <br /> REQUIRING APPROVAL PRIOR TO EXCAVATION OF THE THIRD <br /> BENCH. <br /> Stipulation No. 9 SUNNYSIDE GOLD CORPORATION HAS COMMITTED TO A <br /> MONITORING PLAN WHEREBY EROSION OF AREAS UPSLOPE OF THE <br /> PIT EXCAVATING MAY BE MEASURED AND COMPARED TO SIMILAR, <br /> ADJACENT UNDISTURBED LAND. MEASUREMENTS ARE PROPOSED <br /> TO BE TAKEN AT THREE LOCATIONS ABOVE EACH PIT AND SIX <br /> UNDISTURBED SITES DURING THE SPRING AND FALL OF EACH <br /> YEAR. EVALUATION OF THE RESULTS SHOULD INCLUDE A <br /> DEMONSTRATION THAT THE OPERATION WILL MAINTAIN <br /> COMPLIANCE WITH THE FOLLOWING PERFORMANCE STANDARDS: <br /> C.R.S. 34-32(1 )(H)(I)(J ). <br /> Stipulation No. 10 REFER TO STIPULATION NO. 9: S.S.G.C. EVALUATION OF THE <br /> EROSION MONITORING RESULTS WILL BE SUBMITTED WITH THE <br /> ANNUAL REPORTS IF RESULTS SHOW THAT MODIFICATIONS TO <br /> THE CURRENT DESIGNS ARE REQUIRED TO ENSURE <br /> STABILIZATION, THE MODELS WILL BE SUBMITTED AS A <br /> TECHNICAL REVISION REQUIRING APPROVAL PRIOR TO THE <br /> NEXT FIELD OPERATING SEASON. <br />