My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-27_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2012-08-27_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:06:53 PM
Creation date
8/28/2012 9:50:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REVISION
Doc Date
8/27/2012
Doc Name
Adequacy Response No. 1
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
RN3
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jason Musick <br />Sincerely, <br />the northwest side of the reclamation area with no shrubs established. NECC needs to <br />replant the shrub plot areas in order to meet this woody plant success requirement. If <br />NECC has established other shrub plot locations, an inventory of the remaining woody <br />stems established within the plot, followed by additional transplants may be necessary for <br />NECC to meet the woody plant density criteria at final bond release. <br />NECC - Request noted. <br />13. Attached is the reclamation cost estimate for the 2012 Lorencito Permit Renewal, RN -3. <br />The Division updated the reclamation cost estimate with costs updated in the second half <br />of 2011. This updated estimate represents a new liability of $793,279.42.. This estimate <br />includes tasks identified in the permit and included a cost update only, as no revisions <br />were approved since the previous estimate was last updated with the 2010 Midterm <br />Review. This RN -3 revised cost estimate is $133,841.58 less than the current bond held <br />of $927,121.00. Please review the attached estimate and if you have any questions or <br />concerns. <br />NECC - The reclamation cost estimate is acceptable. <br />J. E.� <br />over, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />Attachments: <br />Pages i, ix, 2.03 -3 through 13, 2.05 -40 <br />Map 2.03.4 -1 <br />August 23, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.