My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-23_PERMIT FILE - M2012040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012040
>
2012-07-23_PERMIT FILE - M2012040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 1:04:52 PM
Creation date
8/27/2012 11:34:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012040
IBM Index Class Name
Permit File
Doc Date
7/23/2012
Doc Name
IS IT MINING RESPONSE
From
UDFCD
To
DRMS
Email Name
AJW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />ti <br />F <br />R <br />0 <br />CONTRACT DRAWINGS FOR CONSTRUCTION OF <br />SHEET <br />INDEX OF DRAWINGS <br />DRAWING <br />CHERRY CREEK IMPROVEMENTS AT ECO PARK <br />NO. <br />NO. <br />DRAWING NAME <br />100% SUBMITTAL <br />1 <br />` <br />TITLE SHEET <br />URBAN DRAINAGE AND FLOOD CONTROL DISTRICT <br />10 <br />11 <br />G 1 <br />C -2 <br />CHERRY CREEK GRADING PLAN 1 <br />CHERRY CREEK GRADING PLAN2 <br />2 <br />3 <br />G-2 <br />G-3 <br />GENERAL NOTES AND LEGEND <br />N <br />SOUTHEAST METRO STORMWATER AUTHORITY <br />4 <br />G-4 <br />DEMOLITION <br />GEOTEC NICAL BORING LOGS <br />GEOTECH <br />UDFCD CONTRACT # 11 -05.04 <br />URBAN DRAINAGE AND <br />FLOOD CONTROL DISTRICT <br />5 <br />6 <br />DM-1 <br />DM-2 <br />CHERRY CREEK DEMOLITION AND TREE REMOVAL PLAN 1 <br />CHERRY CREEK DEMOLITION AND TREE REMOVAL R AN 2 <br />y <br />p�k <br />C(egµ <br />Fo smile � <br />N <br />7 <br />DII <br />CHERRY CREEK DEMOLITION AND TREE REMOVAL RAN 3 <br />` <br />— <br />Boul E <br />8 <br />9 <br />OK4 4 <br />DM-5 <br />CHERRY CREEK DEMOLITION AND TREE REMOVAL PLAN 4 <br />CHERRY CREEK DEMOLITION AND TREE REMOVAL PLAN 5 <br />1 <br />BODIDS6 <br />f ek J <br />14 <br />Cl ev ADAMS \/I <br />I� <br />m , ^' <br />5 COOT ro ,/ � <br />� <br />10 <br />11 <br />G 1 <br />C -2 <br />CHERRY CREEK GRADING PLAN 1 <br />CHERRY CREEK GRADING PLAN2 <br />W c 0 <br />Q I <br />12 <br />C -3 <br />CHERRY CREEK GRADING PLANS <br />< <br />W? <br />13 <br />C-4 <br />CHERRY CREEK GRADING PLAN4 <br />14 <br />GS <br />CHERRY CREEK GRADING PLANS <br />15 <br />C -8 <br />CHERRY CREEK PRIMARY CHANNEL PROFILE <br />R, sf o� <br />16 <br />C-7 <br />TRIBUTARY AND SECONDARY CHANNEL PROFILES <br />17 <br />C-8 <br />CHERRY CREEK CHANNEL SECTIONS SECTIO <br />JzrFIIg$DN <br />s PP <br />\o�d rn <br />18 <br />G9 <br />CHERRY CREEK CHANNEL SECTIONS <br />i 1e0r <br />19 <br />G70 <br />BANK PROTECTION DETAILS <br />t <br />ro oke <br />DSIIYSR <br />^ 70 <br />20 <br />G11 <br />BANK PROTECTION DETAILS <br />d <br />rwo�o <br />ch <br />e4 <br />21 <br />C-12 <br />STORM SEWER PLAN AND PROFILES <br />22 <br />C-13 <br />STORM SEWER OUTLET STRUCTURE PLAN AND SECTIONS <br />ems. <br />1 �ro m <br />23 <br />C-14 <br />WELL OUTFALL PLAN AND PROFILES <br />Creek AHOB <br />24 <br />C-15 <br />STORM SEWER AND WELL OUTFACE DETAILS <br />25 <br />C-16 <br />P BASE MANHOLE DETALS <br />rk <br />26 <br />G17 <br />P BASE MANHOLE DETALS <br />27 <br />C-18 <br />TRAIL DETAILS <br />4G <br />28 <br />C-19 <br />MISCELLANEOUS DETAILS <br />ro <br />29 <br />G20 <br />MISCELLANEOUS DETAILS <br />. I 1 <br />c� <br />pef � <br />DOUGLAS <br />PROJECT <br />DROP <br />STRUCTURES <br />1 F <br />LOCATION <br />30 <br />D -1 <br />LOOSE BOLDER TIE-IN DROP FLAN <br />o < <br />�3 <br />31 <br />D -2 <br />LOOSE BOULDER TIE -IN DROP DETAILS <br />i <br />32 <br />D -3 <br />TRAIL CROSSING 17 SCULPTED CONCRETE DROP PLAN <br />33 <br />D-4 <br />TRAL CROSSING 17 SCULPTED CONCRETE DROP SECTIONS <br />\ P <br />34 <br />D-5 <br />TRAIL CROSSING DETAILS <br />' t =• <br />35 <br />D-6 <br />V RIFFLE DROP DETAILS <br />MILES <br />36 <br />D-7 <br />SECONDARY CHANNEL RIFFLE DROP DETAILS <br />0 5 10 15 20 <br />37 <br />D-8 <br />SPUTTER SCULPTED CONCRETE DROP PLAN <br />38 <br />D -9 <br />SPUTTER SCLLPTED CONCRETE DROP SECTIONS <br />z " .p,, <br />0 5 10 5 <br />39 <br />D-10 <br />BRONCOS PARKWAY SCULPTED CONCRETE DROP PLAN; <br />. <br />KILOMETERS <br />40 <br />D-11 <br />BRONCOS PARKWAY SCULPTED CONCRETE DROP SECTIONS <br />VICINITY MAP <br />41 <br />D-12 <br />HAPPY CANYON CREEK SCULPTED CONCRETE DROP PLAN <br />42 <br />D-13 <br />HAPPY CANYON CREEK SCULPTED CONCRETE DROP SECTIONS <br />LOCATION MAP <br />43 <br />D-14 <br />LATERAL 1AER STRUCTURE PLAN AND SECTIONS <br />44 <br />D -15 <br />DROP STRUCTURE DETAILS <br />SCALE: 1" =1000' <br />CHERRY CREEK BASIN WATER QUALITY AUTHORITY <br />LANO� _ m <br />URBAN DRAINAGE AND FLOOD CONTROL DISTRICT <br />45 <br />L -1 <br />LANDSCAPE PLAN 1 <br />46 <br />L -2 <br />LANDSCAPE PLAN 2 <br />BILL RUZZO; TECHNICAL MANAGER <br />DATE <br />47 <br />L -3 <br />LANDSCAPE PLAN 3 <br />48 <br />L -4 <br />LANDSCAPE PLAN 4 <br />PAULA. HINDMAN; EXECUTIVE DIRECTOR DATE <br />49 <br />L -5 <br />LANDSCAPE PLAN 5 <br />ARAPAHOE COUNTY <br />50 <br />L-6 <br />SEEDING PLAN 1 <br />51 <br />L -7 <br />SEEDING PLAN 2 <br />52 <br />L -8 <br />SEEDING PLAN <br />DAVID B. BENNETTS; MANAGER OF DESIGN, CONSTRUCTION, DATE <br />53 <br />L -9 <br />SEEDING PLAN 4 <br />AND MAINTENANCE PROGRAM <br />AND.. <br />SHANNON CARTER; STRATEGIC PROGRAMS DIRECTOR <br />DATE <br />54 <br />L -10 <br />SEEDING PLANT 5 <br />55 <br />L -11 <br />AMENITY PENN 1 <br />58 <br />L-12 <br />AMENITY PLAN <br />RICHARD G. BORCHARDT; SENIOR PROJECT ENGINEER FOR DESIGN, DATE <br />r coy Ut CmteiiniN <br />CITY OF CENTENNIAL <br />57 <br />L -13 <br />AMENTY PLAN 3 <br />CONSTRUCTION, AND MAINTENANCE PROGRAM <br />58 <br />L -14 <br />AIII PLAN 4 <br />59 <br />L -15 <br />AMENTY PLAN S <br />to trkraet tr n¢ <br />rmwatca SOUTHEAST METRO STORMWATER AUTHORITY <br />60 <br />L -16 <br />PLAN ENLARGEMENTS <br />EDWARD STAFFORD; DEPUTY DIRECTOR OF PUBLIC WORKS/CITY ENGINEER <br />DATE <br />61 <br />L -17 <br />LANDSCAPE NDTESJSCI-EDULE <br />62 <br />L -18 <br />LANDSCAPE DETAILS <br />83 <br />L -19 <br />SITE DETAILS <br />JOHN MCCARTY: EXECUTIVE DIRECTOR DATE <br />MULLER ENGINEERING <br />64 <br />L -20 <br />SITE DETAILS <br />SEMSWA CASE # C09 -3001 <br />DENNIS WELKER: CAPITAL IMPROVEMENTS PROGRAM MANAGER DATE <br />DATE <br />PROJECT MANAGER <br />ARAPAHOE COUNTY <br />CASE # E12 <br />-001 <br />MULLER ENGINEERING CO., INC. <br />-NSULT1NC 1NCUVEexs <br />° �'RS <br />DRAWN <br />SOUTHEAST METRO <br />URBAN DRAINAGE AND <br />CHERRY CREEK <br />GENERAL <br />DWG. G' 1 O. <br />7 SOUTH WADSWORM BLW SU 1E41W <br />® <br />LLD <br />°` % "'K' `" STORMWATER <br />nnw^ � <br />IMPROVEMENTS <br />TITLE SHEET <br />LAhEW —D, COLORADO 8=L <br />(M3)988439 <br />cN�P� <br />yr <br />FLOOD CONTROL DISTRICT <br />SHEET NO. <br />No. <br />DATE <br />REVISIONS <br />APPR. <br />PROJEOTNO 0M3102 <br />AUTHORITY <br />AT ECO PARK <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.