Laserfiche WebLink
Table 13 - Summary of Depletions <br />08/31/10 <br />By: WRS, LLC <br />Column 1- From Table 9, maximum that occurred in each month from 1998 to 2008 <br />Column 2 - from Table 12, maximum occurred in years 2012 and 2013 <br />Column 3 - From BBA Report, mine facility well(s) at NHN and Cyrpus. The monthly amounts vary slightly. <br />The monthly amounts vary slightly between NHN and Cyprus but total is the same. <br />Column 4 - From BBA report <br />Column 5 - From BBA report <br />Column 6 - sum of (1) to (5) <br />Maximum <br />dust <br />suppression <br />Max Pond <br />evaporation <br />Lagged NHN <br />and Cyprus <br />domestic <br />wells <br />Well -to <br />well <br />impacts <br />Mine <br />pumping <br />TOTAL <br />Unit <br />af <br />af <br />af <br />af <br />af <br />af <br />Column <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />January <br />1.86 <br />0.00 <br />0.02 <br />0 <br />0 <br />1.88 <br />February <br />2.80 <br />0.00 <br />0.01 <br />0 <br />0 <br />2.81 <br />March <br />5.69 <br />2.28 <br />0.01 <br />0 <br />0 <br />7.98 <br />April <br />8.56 <br />3.84 <br />0.01 <br />0 <br />0 <br />12.41 <br />May <br />7.93 <br />5.15 <br />0.01 <br />0 <br />0 <br />13.09 <br />June <br />8.62 <br />6.32 <br />0.02 <br />0 <br />0 <br />14.95 <br />July <br />7.15 <br />6.40 <br />0.02 <br />0 <br />0 <br />13.57 <br />August <br />6.27 <br />5.74 <br />0.03 <br />0 <br />0 <br />12.04 <br />September <br />4.45 <br />4.22 <br />0.03 <br />0 <br />0 <br />8.70 <br />October <br />6.16 <br />2.88 <br />0.02 <br />0 <br />0 <br />9.06 <br />November <br />3.59 <br />1.59 <br />0.02 <br />0 <br />0 <br />5.20 <br />December <br />1.96 <br />0.00 <br />0.02 <br />0 <br />0 <br />1.98 <br />total <br />65.05 <br />38.42 <br />0.22 <br />0.00 <br />0.00 <br />103.68 <br />Table 13 - Summary of Depletions <br />08/31/10 <br />By: WRS, LLC <br />Column 1- From Table 9, maximum that occurred in each month from 1998 to 2008 <br />Column 2 - from Table 12, maximum occurred in years 2012 and 2013 <br />Column 3 - From BBA Report, mine facility well(s) at NHN and Cyrpus. The monthly amounts vary slightly. <br />The monthly amounts vary slightly between NHN and Cyprus but total is the same. <br />Column 4 - From BBA report <br />Column 5 - From BBA report <br />Column 6 - sum of (1) to (5) <br />