Water accumulating in the pit(s) will be removed by pumping the water to a sediment pond that <br />will, at the time of pumping, have a sufficient available storage capacity, including the <br />prescribed volume for the 10 -year, 24 -hour storm. Design criteria for all ponds are addressed in <br />Section 2.05.3(3), Mine Facilities, and include plans for storage of additional volumes pumped <br />from pits or sumps. Maintenance of available storage capacity in the ponds involves dewatering <br />and sediment removal. <br />Ground Water Monitoring Since 1979, Peabody (New Horizon Mine's predecessor) and WFC <br />have installed an extensive network of 46 hydrologic monitoring holes to monitor the shallow <br />bed rock zones beneath both the New Horizon 1 and the New Horizon 2 mining areas. A <br />number of these holes were located within or in close proximity to the NHN permit area (see <br />Map 2.04.7 -1 in Section 2.04.7, Hydrology Description). This information has been <br />supplemented by the addition of nine new hydrologic monitoring holes which were installed <br />during 2008 for baseline hydrologic data collection. These new holes (numbered GW -N47 <br />through GW -N55) are described in Section 2.04.7 and the data collected presented in <br />Appendices 2.04.7 -1. Physical data (temperature, pH, conductivity, depth) are collected monthly <br />and samples for chemical analyses are collected quarterly. This schedule will continue for the <br />foreseeable future. It is expected that these nine new baseline monitoring holes will be employed <br />to monitor the extent and magnitude of any mining impacts as also discussed in Sections 2.04.7 <br />and Section 2.05.6(3)(b)(v), Hydrologic Reclamation Plan. The ground water monitoring holes <br />will be maintained for the life of the mining operations or until such time as DRMS may agree <br />that they are no longer necessary. All ground water monitoring installations will be removed <br />upon completion of the post mining hydrologic monitoring phase of the Hydrologic Monitoring <br />Program. <br />All ground water data collected from monitoring wells in each future water year will be <br />compiled and submitted to DRMS in the form of the New Horizon Annual Hydrology Report <br />(AHR). The AHRs will be submitted within three months after the end of each water year. <br />Surface Water Protection Section 2.05.3(3), Mine Facilities, contains descriptions, designs, <br />and plans for a sediment ponds, roads, diversions, and culverts that will be constructed and <br />utilized at New Horizon North mining area during mining All facilities that are discussed in <br />Section 2.05.3(3) have been designed to ensure that the hydrologic balance is protected. <br />The discussion for surface water protection has been separated into three parts: 1) surface water <br />quality; 2) surface water quantity; and 3) surface water monitoring. <br />Surface Water Quality Sediment ponds will be adequately designed and will be constructed <br />during the proposed operations for controlling surface water runoff from disturbed and reclaimed <br />areas. An NPDES permit will be obtained from Water Quality Control Division, Colorado <br />Department of Public Health and Environment to allow the discharge of water from the sediment <br />Section 2.05.6(3) Page 4 November 2011 <br />