My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:23 PM
Creation date
8/24/2012 2:39:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Revegetation Plan
Section_Exhibit Name
Section 2.05.4(2)(e)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
truck scale at the local power plant or a nearby gravel pit. If none of these are available, a scale <br />will be rented to conduct the weighing. The bale weights will be converted to a production per <br />acre of the desirable species. <br />Final monitoring for bond release will occur in years 9 and 10 following final reclamation or <br />later. Final monitoring of reclaimed Pasture Dryland Pasture will consist of evaluations to meet <br />all requirements in the success standards. <br />Regrading or Stabilizing Rills and Gullies - All Areas <br />After an area has been backfilled, graded, and topsoiled, WFC will monitor the reclaimed area <br />following any heavy spring snow melt or heavy rains. If, upon observation, excessive rills and <br />gullies do occur or there is an indication they may occur in areas that have been reclaimed, closer <br />observation of the area will begin to determine, if possible, the cause of the gullying. The natural <br />geomorphic processes of the reclaimed area will be given a great deal of consideration; taking <br />into account the slope and climatic conditions of the site. <br />Monitoring for rills and gullies will be carried out on a periodic basis; the monitoring being <br />geared to those periods after spring snow melt and following any significant storm events which <br />may occur in the vicinity of the mine site. The results of any rill and gully monitoring will be <br />documented in the administrative files located in the New Horizon mine office. These files will <br />also contain a map showing the location of those areas requiring repair. When the occurrence of <br />excessive rills and gullies necessitates implementation of the following of any of the following <br />remediation methods, CDRMS will be notified prior to any corrective action being taken. <br />After observation, WFC will consider several options to remediate this situation. These options <br />will be a direct result of studying the situation and selecting the option that, in the opinion of <br />WFC, will rectify the erosional problem. One of, or a combination of, the following options and <br />corrective methods will be employed. <br />Improved Channel If it is determined that the regraded area does not have positive drainage, <br />then this area will be regraded to ensure proper drainage occurs. The drainage bottom or channel <br />Section 2.05.4(2)(e) Page 35 January 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.