Laserfiche WebLink
Section 2.05.3(6)(a) <br />OVERBURDEN BLASTING <br />TABLE OF CONTENTS <br />Introduction <br />Pre -blast Surveys <br />Blast Design <br />Production <br />Explosive Selection and Poundage <br />Explosive Storage <br />Blasting Procedures <br />Blasting Limitations <br />Air -blast <br />Ground Vibration <br />Fly -Rock <br />Blasting within 500 feet of Pipeline <br />Blasting Schedule <br />Blasters <br />Blasting Signs, Warnings and Access Control <br />Unavoidable Hazards <br />Records <br />TABLES <br />1 <br />1 <br />2 <br />4 <br />5 <br />5 <br />6 <br />6 <br />6 <br />7 <br />7 <br />7 <br />8 <br />9 <br />9 <br />10 <br />10 <br />Table 2.05.3(6)(a) -1 11 <br />AIR -BLAST LIMITS <br />MAXIMUM PEAK PARTICLE VELOCITY LIMITS <br />