My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/24/2012 10:42:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Overburden Blasting
Section_Exhibit Name
Section 2.05.3(6)(a)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blasting Schedule <br />All blasting will be conducted between sunrise and sunset at times and at locations defined in <br />the published blasting schedule. Unscheduled blasts would be conducted only where public or <br />operator health and safety so require and for emergency blasting actions described in the <br />blasting schedule. <br />The blasting schedule will identify as accurately as possible the location of the blasting site and <br />the time periods when blasting will occur. The blasting schedule will contain at a minimum: <br />a. Identification of the specific areas in which blasting will take place. The specific <br />blasting areas described will not be larger than 300 acres and will be reasonably <br />compact; <br />b. Dates and times when explosives are to be detonated; <br />c. Methods to be used to control access to the blasting area; <br />d. Types of audible warnings and all clear signals to be used before and after blasting; <br />e. A description of possible unavoidable hazardous situations when it may be necessary <br />to blast at times other than those described in the schedule. <br />WFC will publish a blasting schedule in the San Miguel Basin Forum which is the newspaper <br />having general circulation in the area in which the mining complex is located. The blasting <br />schedule will be published every twelve months and at least ten days, but not more than 20 <br />days before beginning blasting whenever the area covered by the schedule changes or <br />whenever periods for blasting significantly differ from the prior announcement. See Attachment <br />2.05.(6)(a) -1 for example. <br />If the change is temporary in nature, local governments and individuals to whom the original <br />schedule was sent shall be notified by telephone or personal contact followed by written notice. <br />A copy of the published blasting schedule will be mailed to the local utility companies and local <br />business, such as San Miguel Power Company, Nucla - Naturita Telephone Company, and the <br />Section 2.05.3 (6) (a) Page 8 February 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.