Laserfiche WebLink
B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations - Surface Runoff or Non -Coal Mining Related Waste Streams <br />PART 1 <br />Page No. 4 <br />Permit No. COG - 850000 <br />5. No chemicals shall be added to the discharge unless the Division grants specific approval in a certification, letter, or other <br />form of communication. To approve a new chemical, the Division must have the chemical's MSDS sheet. All chemicals <br />must be used and stored in accordance with the manufacturers recommendations and in accordance with any applicable <br />state or federal regulation. <br />6. There shall be no discharge of solid animal or food waste, vegetative wastes (grass, leaves, manure, garbage, etc), or any <br />floating solids or visible foam, in other than trace amounts. <br />7. All discharges must comply with the lawful requirements of federal agencies, municipalities, counties, drainage districts <br />and other local agencies regarding any discharges to storm drains systems, conveyances, or other water courses under their <br />jurisdiction. In addition, prior to the discharge the permittee must notify the owner of the system of the date, approximate <br />time, location, and duration of the discharge(s). <br />Flow, MGD <br />General Permit Requirements <br />Continuous / Recorder / <br />Report NA Report Discharge Evaluation Instantaneous In -situ 2 <br />pH, s.u. N/A NA 6.5 -9.0 Water Quality Standards Weekly Grab <br />Oil and Grease, mg/I N/A NA 10 State Effluent Regulations Weekly Visual 3 <br />- ____--- ___....___---- _- -_ -_-- Federal Effluent Limitation Guidelines---------------------------- <br />Settleable Solids, ml/1 Report NA 0.5 Federal ELG Weekly Grab <br />Settleable Solids, mlJl * Report NA Report Federal ELG Weekly Grab <br />- --Site Specific Limitations <br />Total Dissolved Solids, mg/1** Report NA Report Salinity Regulations Quarterly 4 Grab <br />Total Phosphorus (as P), mg/1*** Report NA Various Control Regulations Monthly Grab <br />Other Pollutants of Concern Various NA Various Water Quality Standards Weekly Grab <br />1— For a minor facility, as determined by the EPA NPDES Permit Rating Worksheet, all weekly monitoring requirements shall be changed to 2 days per month. <br />2 — If power is not available, flow may be measured on an instantaneous basis. Major facilities shall monitor flow weekly, minor facilities 2 days / month <br />3 — If a visual sheen is noticed, a grab sample must be taken and analyzed for oil and grease <br />4 — Quarterly monitoring shall be prescribed if the limitation is based upon discharge to the Colorado River Basin. If the limitation is based upon agricultural <br />protection, the monitoring frequency shall be weekly. <br />* If caused by precipitation within any 24 -hour period greater than the 10 -year, 24 -hour precipitation event (or snowmelt of equivalent volume) <br />** The TDS limitation will normally apply to discharges in the Colorado River Basin. An evaluation of the discharge will take place upon certification, to see if the <br />facility meets the 1 ton/day or 350 tons /year allowable discharge of salt. lithe facility does not meet this requirement, the facility will be required to submit a <br />salinity report documenting that achieving this level of discharge is not feasible. See Regulation 61.8(2)(1) for more information. <br />* ** The phosphorus limitations apply to discharges to the Dillon Reservoir Wateshed, Cherry Creek Reservoir Watershed, Chatfield Reservoir Watershed, and the <br />Bear Creek Watershed, as defined in Regulation 71, 72, 73 or 74 respectively. The permittee may be required to obtain a phosphorus allocation from the applicable <br />control regulation authority prior to certification under this general permit, <br />2. Effluent Limitations — Alkaline Drainage, Coal Preparation Plants and Coal Preparation Plant Associated Areas and Western <br />Alkaline Coal Mining (additional requirements may apply to Western Coal Mining, See Part I.B.2) <br />a. Alkaline Mine Drainage - means mine drainage which, before any treatment, has a pH equal to or greater than 6.0 and <br />total iron concentration of less than 10 mg/1. <br />b. Coal Preparation Plants — means a facility where coal is subjected to cleaning, concentrating, or other processing or <br />preparation in order to separate coal from its impurities and then is loaded for transit to a consuming facility. <br />c. Coal Preparation Plant Associated Areas - means the coal preparation plant yards, immediate access roads, coal <br />refuse piles and coal storage piles and facilities. <br />d. Western Coal Mining Operation - means a surface or underground coal mining operation located in the interior <br />C+Ar.e. s.nnt .,f R.a 1 flAtil mAri.t+nn a,n+et 1ny+nih,AP in an orirt nr ePmiari rl Pnvirnnmant with an avara aP <br />