My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089 (57)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2012-06-20_PERMIT FILE - C2010089 (57)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:15 PM
Creation date
8/24/2012 10:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Water Discharge Permit
Section_Exhibit Name
Appendix 2.05.3(4)-3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />PA WI 1 <br />Page No. 2 <br />Permit No. COG-850000 <br />PART I 3 <br />A. COVERAGE UNDER THIS PERMIT 3 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS 4 <br />1. Effluent Limitations - Surface Runoff or Non-Coal Mining Related Waste Streams 4 <br />2. Effluent Limitations - Alkaline Drainage, Coal Preparation Plants and Coal Preparation Plant Associated Areas and <br />Western Alkaline Coal Mining (additional requirements may apply to Western Coal Mining, See Part I.B.2) 4 <br />3. Effluent Limitations - Western Alkaline Coal Mining 6 <br />4. Effluent Limitations - Post Mining Areas 7 <br />5. Effluent Limitations and Monitoring Requirements - Acid or Ferruginous Mine Drainage 8 <br />6. Burden of Proof Requirements 10 <br />7. Compliance Schedules 10 <br />8. WET Testing 10 <br />C. STORMWATER REQUIREMENTS 13 <br />1. Stormwater Management Plan (SWMP) 13 <br />D. DEFINITIONS OF TERMS 16 <br />E. GENERAL MONITORING, SAMPLING, AND REPORTING REQUIREMENTS 18 <br />1. Routine Reporting of Data 18 <br />2. Reporting - Stormwater Annual Report 18 <br />3. Representative Sampling 18 <br />4. Analytical and Sampling Methods for Monitoring 19 <br />5. Records 19 <br />6. Flow Measuring Device 20 <br />7. Signatory and Certification Requirements 20 <br />PART II 22 <br />A. NOTIFICATION REQUIREMENTS 22 <br />1. Notification to Parties 22 <br />2. Change in Discharge 22 <br />3. Special Notifications - Definitions 22 <br />4. Noncompliance Notification 23 <br />5. Other Notification Requirements 23 <br />6. Bypass Notification 24 <br />7. Upsets 24 <br />8. Discharge Point 24 <br />9. Proper Operation and Maintenance 24 <br />10. Minimization of Adverse Impact <br />11. Removed Substances 25 <br />12.Submission of Incorrect or Incomplete Information 25 <br />13. Bypass 25 <br />14. Reduction, Loss, or Failure of Treatment Facility 25 <br />B. RESPONSIBILITIES 26 <br />1. Inspections and Right to Entry 26 <br />2. Duty to Provide Information 26 <br />3. Transfer of Ownership or Control 26 <br />4. Availability of Reports 26 <br />5. Modification, Suspension, Revocation, or Termination of Permits By the Division 27 <br />6. Oil and Hazardous Substance Liability 28 <br />7. State Laws 28 <br />8. Permit Violations 29 <br />9. Property Rights 29 <br />10.Severability 29 <br />11. Renewal Application 29 <br />12. Confidentiality 29 <br />13. Fees 29 <br />14. Duration of Permit 29 <br />15. Section 307 Toxics 29 <br />16. Antibacksliding 29 <br />17. Effect of Permit Issuance 30 <br />18. Requiring an Individual CDPS Permit 31 <br />19. Requesting an Individual CDPS Permit 31 <br />20. Requesting Coverage Under the General Permit 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.