My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089 (57)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2012-06-20_PERMIT FILE - C2010089 (57)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:15 PM
Creation date
8/24/2012 10:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Water Discharge Permit
Section_Exhibit Name
Appendix 2.05.3(4)-3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, Water Quality Control Division <br />Rationale, Page 10, COG - 0850000 Coal Mining General Permit <br />may have additional constraints placed upon the discharge. These constraints may include accepting end of pipe limitations (no <br />dilution), moving the discharge point to a different location, or using a ditser to obtain an instantaneous mixing of the effluent <br />and the receiving water. This last option may allow for a portion of the available assimilative capacity (dilution) to be <br />incorporated into the perrnit. However, as this, is a general permit, all limitations are imposed as end ofpipe limits, and <br />therefore, the first option is met. Generally, it will be assumed that the end of pipe limitations will satisfy the MOA, and no <br />further consideration is needed. On a case -by -case basis, additional constraints may need to be evaluated. <br />i. Mixing Zones – Under this general permit mixing zone regulations do not apply, as the water quality standards are applied as <br />the effluent limits(i.e., no dilution is allowed.). <br />j. Discharges to 303(d) Listed Waters —Where the receiving water is included on the state's 303(d) list, total maximum daily <br />loads (TMDLs) are being developed in accordance with the Division's schedule for TMDL cornpletion. Once a TMDL has <br />been established, if it is necessary to incorporate limitations for a facility certified under this general permit, based upon the <br />outcomes of the TMDL or the Jesuits of the data analysis, a modification to the certification to discharge, or an individual <br />permit may be required to regulate discharges front a facility. The facility would continue to be covered under this general <br />permit certification until the individual permit is issued. <br />k Compliance Schedules- Existing discha gers may be granted compliance schedules for any new effluent limitations applicable <br />to the discharge, Some items requiring a compliance schedule may require an individual permit. Note.that compliance <br />schedules cannot be granted for limitations based upon the federal ELGs. <br />V. STORMWATER DISCHARGES <br />Stormwater requirements have been included in this general permit and are outlined in Part I,C of the permit. <br />VI. PUBLIC NOTICE COMMENTS <br />No comments were.received during the public notice period. Note that the Division eliminated the 2 year rnaxirnufn compliance <br />schedule requirement. <br />Andrew J. Neuhart <br />May 28, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.