Laserfiche WebLink
PART 1 <br />Page No. 20 <br />Permit No. COG - 850000 <br />6. Flow Measuring Device <br />If not already b a part liethe <br />o give sent five value of (90) days <br />quantities at the respective date <br />d s harrge permit, a flow <br />Unless measuring <br />specifically shall exempted ted installed t p <br />specifi exmped or modified by the Division, aflow- measuring device will be applicable at all designated discharge <br />points. <br />At e ob t ta inng i d da t ta of the Did sub in sion, the permittee shall the monitoring report. <br />The flowfineasuring device of must indicate values g device <br />ithin ten (10) percent <br />obinng submitted <br />' of the actual flow being discharged from the facility. <br />7. Signatory and Certification Requirements <br />a. All reports and other information required by the Division, shall be signed and certified for accuracy by the permittee <br />in accord with the following criteria: <br />i) In the case of corporations, by a principal executive officer of at least the level of vice- president or his or her duly <br />authorized representative, if such representative is responsible for the overall operation of the facility from which <br />the discharge described in the form originates; <br />ii) In the case of a partnership, by a general partner; <br />iii) In the case of a sole proprietorship, by the proprietor; <br />iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employee. <br />b. All <br />described above required b a du d representative that person. eA Division person shalduly signed by a person pr sentative <br />descibed bo <br />only if: <br />i) The authorization is made in writing by a person described above; <br />ii) The authorization specifies either an individual or a position having respons £ aty ell tt r a ov fll operation of the <br />regulated facility or activity such as the position of plant manager, operator <br />superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for <br />environmental matters for the company. (A duly authorized representative may thus be either a named individual <br />or any individual occupying a named position); and, <br />iii) The written authorization is submitted to the Division. <br />If an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications to be signed by an <br />authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision <br />in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information <br />submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly <br />responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, <br />accurate and complete.' I am aware that there are significant penalties for submitting false information, including the <br />possibility of fine and imprisonment for knowing violations." <br />