My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089 (57)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2012-06-20_PERMIT FILE - C2010089 (57)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:15 PM
Creation date
8/24/2012 10:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Water Discharge Permit
Section_Exhibit Name
Appendix 2.05.3(4)-3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Effluent Limitations — Post Mining Areas <br />Post - mining limitations may apply to outfalls serving reclamation areas, which have been returned to the required contour <br />and on which revegetation (specifically, seeding or planting) work has commenced. Limitations may also apply to 1'0St <br />mining underground mine areas. The permittee may request consideration for change from active mining limitations to <br />post - mining limitations when these conditions have been met: <br />a. Post Mining Reclamation Areas - This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to reclamation areas. The federal ELG limitations would apply until bond release. If these <br />wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this wastewater is <br />combined with post mining underground mine wastewater, then the limitations in Part I.B.3.b apply to the combined <br />discharge. If this post mining wastewater is separate, then the following limitations apply. <br />Flow, MGD <br />pH, s.u. <br />Total Suspended Solids, mg/1 <br />Oil and Grease, mg/I <br />Settleable Solids, m1/1 <br />Total Dissolved Solids, mg/1* <br />Total Phosphorus (as P), mg/1** <br />Total Recoverable Iron, ug/1 <br />Other Pollutants of Concern <br />Whole Effluent Toxicity (WET) <br />Chronic <br />Acute <br />Settleable Solids, ml/1 <br />General Permit Requirements - -- Report NA Report Discharge Evaluation <br />N/A NA 6.5 -9.0 <br />30 45 NA <br />N/A NA 10 <br />Federal Effluent Limitation Guidelines <br />Report NA 0.5 Federal ELG <br />Site Specific Limitations <br />Report <br />Report <br />1000 <br />Various <br />NA <br />NA <br />NA <br />NA <br />Stat Diff and 1C25 > IWC <br />LC50 > 100% <br />Footnotes 1 - 4, * , ** , and * ** can be found under Pan I.B.1 and Part I.B.2. <br />Report <br />Various <br />NA <br />Various <br />-- _----- ----- _— ..--- ---_-- _... -- -- Federal Effluent Limitation Guidelines <br />Water Quality Standards <br />State Effluent Regulations <br />State Effluent Regulations <br />Salinity Regulations <br />Control Regulations <br />Water Quality Standards <br />Water Quality Standards <br />State Permit Limitations <br />State Permit Limitations <br />Continuous / <br />Instantaneous <br />Weekly <br />Weekly <br />Weekly <br />ALTERNATE LIMITATIONS FOR POST - MINING RECLAMATION AREAS <br />Report NA Report Federal ELG Weekly <br />PART 1 - • <br />Page No. 7 <br />Permit No. COG - 850000 <br />Recorder / <br />In -situ 2 <br />Grab <br />Grab <br />Visual 3 <br />Weekly Grab <br />Quarterly 4 Grab <br />Monthly Grab <br />Weekly Grab <br />Weekly Grab <br />Quarterly 3 Grab/Test <br />Grab <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any <br />24 -hour period greater than the 10 -year. 24 -hour precipitation event (or snowmelt of equivalent volume) may <br />substitute the following limitations for these specific parameters only, subject to burden of proof requirements <br />described in Part I.B.6. <br />Grab <br />b. Post Mining Underground Areas - This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to underground areas. The federal ELG limitations would apply until bond release. If <br />these wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this <br />wastewater is combined with post mining reclamation area wastewater, then these limitations apply to the combined <br />discharge. If the post mining wastewater is separate, then the following limitations apply. Discharges of mine <br />drainage from underground workings of underground mines which are not commingled with discharges eligible for <br />alternate limitations set forth in this section shall in no event be eligible for the alternate limitations set forth in this <br />section. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.