My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/24/2012 10:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />Support Facilities <br />Section 2.05.3(3) <br />Mine Facilities <br />This section contains a description of the proposed structures to be used in connection with or to <br />facilitate the surface coal mining and reclamation activities at the New Horizon North (NHN) <br />Mine area described in Section 2.05.3, Operation Plan: Permit Area. <br />Buildings. Proposed buildings include a 60'x90' steel building structure to be used as a shop, a <br />24'x70' mobile building to be used as the mine office, a 20'x40' mobile building to be used as a <br />bath house, a 14'x40' mobile building to be used as a foreman's office, a 24'x70' steel building <br />for use as a warehouse and hose room, three 8'x20' steel cargo containers to be used for <br />warehousing and parts storage, and a fuel and lube oil storage and pump facility consisting of <br />storage vessels contained inside a lined earthen berm that will contain the volume from the <br />largest vessel plus the 10yr -24hr rainfall event. all located at the NHN Mine facilities area. Map <br />2.05.3(3) -1 Facilities Map shows the locations of the buildings. <br />Details of sizes and types of construction for all buildings are shown in Table 2.05.3(3) -1. <br />Waste Water. Sewage from the proposed buildings will be disposed of through proposed septic <br />sewage disposal system. Waste water from the equipment wash will be re- circulated and reused; <br />however, if there is any excess waste water, it will be run through a sediment trap and an oil <br />water separator and discharged to Pond NHN -001 via a natural drainage and the NHN -001 East <br />Ditch. <br />Section 2.05.3(3) Page 1 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.