My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089 (36)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2012-06-20_PERMIT FILE - C2010089 (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:14 PM
Creation date
8/23/2012 1:46:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Surface Water Monitoring Data
Section_Exhibit Name
Appendix 2.04.7-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analytical <br />Report <br />ACZ Laboratories, Inc. <br />2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 <br />Report to: <br />Thomas Fry <br />Western Fuels New Horizon Mine <br />P.O. Box 628 <br />Nucla, CO 81424 <br />Project ID: <br />ACZ Project ID: L86882 <br />Thomas Fry: <br />Bill to: <br />Accounts Payable <br />Western Fuels New Horizon Mine <br />P.O. Box 628 <br />Nucla, CO 81424 <br />March 21, 2011 <br />Enclosed are the analytical results for sample(s) submitted to ACZ Laboratories, Inc. (ACZ) on March 09, <br />2011. This project has been assigned to ACZ's project number, L86882. Please reference this number in all <br />future inquiries. <br />All analyses were performed according to ACZ's Quality Assurance Plan. The enclosed results relate only to <br />the samples received under L86882. Each section of this report has been reviewed and approved by the <br />appropriate Laboratory Supervisor, or a qualified substitute. <br />Except as noted, the test results for the methods and parameters listed on ACZ's current NELAC certificate <br />letter ( #ACZ) meet all requirements of NELAC. <br />This report shall be used or copied only in its entirety. ACZ is not responsible for the consequences arising <br />from the use of a partial report. <br />All samples and sub - samples associated with this project will be disposed of after April 21, 2011. If the <br />samples are determined to be hazardous, additional charges apply for disposal (typically less than <br />$10 /sample). If you would like the samples to be held longer than ACZ's stated policy or to be returned, please <br />contact your Project Manager or Customer Service Representative for further details and associated costs. <br />ACZ retains analytical reports for five years. <br />If you have any questions or other needs, please contact your Project Manager. <br />Sue Webber has reviewed and <br />approved this report. <br />REPAD.01.06.05.02 <br />Page 1 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.