Laserfiche WebLink
BORROW AREA: <br /> Approximately 60 ,000 cubic yards of overburden material will be <br /> required to cover Tailings Pond #1. The material will be obtained <br /> from extension of the area approved in TR09 and TR11 . At this <br /> time the area is thought to be adequate for this intended usage. <br /> Reclamation of this area will be the same as proposed and approved <br /> in TR11 . <br />