Laserfiche WebLink
TAILINGS POND NUMBER TWO <br /> RECLAMATION PLAN <br /> The ultimate goal of the reclamation plan for Tailings Pond 42 is <br /> to establish a self sustaining vegetative cover on the pond. The <br /> plan incorporates five steps to achieve this. <br /> I . Resloping Sides of Pond: <br /> The side slopes of the pond will be brought to a slope of <br /> approximately 2 . 5 : 1 . This will be accomplished either by <br /> cutting or filling various sections of the pond slopes <br /> depending on their current configuration. <br /> II . Regrading Top of The Pond: <br /> The top of the pond will be sloped towards the hillside at <br /> approximately a 20 grade. This will be accomplished with <br /> tailings excavated from the sides of the pond during <br /> resloping. <br /> III . Overburden Covering: <br /> The entire pond area will be covered with approximately one <br /> foot of overburden. The overburden will be placed in such a <br /> fashion so as to minimize compaction and create a <br /> satisfactory seedbed. The overburden will be borrowed from <br /> the designated area northeast of Tailings Pond #4. <br /> IV. Seeding and Planting: <br /> The reclaimed area (approximately 18 acres) will be <br /> fertilized and seeded during the summer of 1992. It is <br /> preferable to seed in late June or early July to take <br /> advantage of the above average precipitation during this <br /> period. The seed mixture will be the "Mountain Mix" <br /> specified in Table E-4 of the Consolidated Permit <br /> Application. The seed mixture will be applied at 20lb/acre <br /> (minimum) . Prior to seeding the overburden will be analyzed <br /> to determine the type and application rate of fertilizer to <br /> be applied. In some cases other soil amendments such as <br /> limestone may also be applied to the overburden. The <br /> proposed borrow material is expected to be similar to that <br /> used to cover Pond #4 . The fertilizer recommended for Pond <br /> #4 was 200#N,40# P205 , and 60#K20 per acre (The nitrogen will <br /> be added over a 2 year period to prevent burning the seeds) . <br /> Approximately 0. 9 tons of limestone per acre were applied on <br /> Pond #4 for PH control. <br /> -1- <br />