My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-09-21_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1998-09-21_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 6:17:20 AM
Creation date
8/23/2012 10:37:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
9/21/1998
Doc Name
Permit Certification Modification
From
CDPHE-WQCD
To
Sunnyside Gold Corp
Type & Sequence
TR21
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ' <br /> Attachment TP4UGD <br /> Page No.TP4UGD- 2 <br /> Permit No. CO-0044768 <br /> Identification of Lands <br /> The project area is on land owned by Sunmyside Gold Corporation (SGC)or Public Land(BLM) <br /> where SGC has right of use through unpatented mill site claims. The probable location of the cutoff <br /> wall is also likely to be within the boundary of the Tailings Pond No.4 Mined Land Reclamation <br /> Permit area (M-77-378) and Stornnwater Permit area (COR-040054). <br /> Latitude 37 degrees 49 minutes <br /> Longitude 107 degrees 39 minutes <br /> Identification of the Waters of the United States Potentiallv Affected <br /> Segment 3A of the Anunas River would be the Waters of the United States that this project would <br /> have the potential to benefit <br /> 2. Site Mau <br /> Attached <br /> 3. StormNvater Management Controls <br /> During construction. SGC will use temporary hay bale sediment traps as necessary to minimize <br /> sediment transport from the site For long-term control of sediment transport, SGC will plant and <br /> establish vegetation on the disturbed area <br /> 4. Inspection and Record KeepmQ Procedures <br /> The Reclamation Manager or Technical Service Department will inspect this project during <br /> construction for conformance to the work plan Progress reports on this project will be incorporated <br /> into the monthly report including quarterly photographs to Colorado Division of Minerals and <br /> Geolog\ and the Colorado Department of Public Health and Environment for CDPS Permit No. <br /> CO- 0044768 <br /> 5. Mine Remediation Plan <br /> Lee'al Right to Enter and Conduct Activities <br /> SGC o\\ns the propert\ \\here this project will be implemented In addition,the project is within <br /> SGC's MLR permit area and an approved TR may be required for installation of the groundwater <br /> cutoff\\all extension <br /> No actin it\ \\ill start prior to obtaining any required approval. If any approvals are required and <br /> cannot be obtained, the project cannot proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.