Laserfiche WebLink
1. Adequate surface drainage should be provided around the rear of <br /> 0 <br /> • the tailings embankment to conduct surface run off from adjacent terrain <br /> away from the beach area. <br /> 2. Reveg4tation of the pond embankment should be made for erosion <br /> control and stability. <br /> 3. Periodic inspections should be made of the toe drain to insure <br /> that it is functioning properly and that no fluid buildup is occuring behind <br /> the earthen berm. <br /> REVIEW <br /> We are available to discuss the details of our conclusions and recommendations <br /> with you. This is especially true if it is desired to continue use of <br /> pond 3. Additional recommendations and analysis can be provided for design <br /> and construction of future tailings embankments or the addition to pond <br /> 3 if desired. <br /> Please call when further consultation is required. Thank you for <br /> 0 the opportunity of working with you on this project. <br /> F. M. OX & ASSOCIATES, INC. Reviewed by: <br /> F. <br /> koa44,�� <br /> Donald R. Clark Robert B. Sennett <br /> Project Engineer 1y .,, Vice President <br /> DRC/cae ,•o�: •oF.�•. <br /> Copies: 5 4710 <br /> q <br /> 00 <br /> OFt CO,Q�o,. <br /> 0 -9- <br />