My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-15_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-07-15_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 3:27:54 PM
Creation date
8/23/2012 7:04:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
7/15/1996
Doc Name
Underground Injection Control
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul - 15-96 11 : 33A Sunn. 'de Gold Corp . 97 387 5310 III 'lllll'II��II �II <br /> 999 <br /> 1/ <br /> SUNNYSIDE GOLD CORPORATION DENVr R <br /> AN ECHO DAY COMPANY ONZI I <br /> P.0 Box 177 . Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> July 15, 1996 R <br /> Attention Ron Zdyb <br /> Mail Code 8D2-W-GW <br /> US Environmental Protection Agency <br /> Underground Injection Control (UIC) Curnr,, <br /> 999 l8th Street, Suite 500 <br /> Denver, CO 80202-2466 <br /> f <br /> RE Underground Injection Control (UIC) <br /> Class V Injection e <br /> Rule Authorization <br /> Injection Site Sunnyside Mine near Silverton, CO <br /> San Juan County <br /> EPA File # C05000-03745 <br /> Dear Mr. Zdyb, <br /> Pursuant to Item 1. in the Rule Authorization Letter requirements for injection of alkaline <br /> water into the Sunnyside Mine, Sunnyside Gold Corporation (SGC) submits this notice of intent <br /> to start injection on July 17, 1996 Valve closure on the American Tunnel bulkhead is scheduled <br /> fo- July 29, 1996 This delay is scheduled to allow SGC to determine if the system is operating as <br /> planned before final valve closure <br /> If you have any questions, please contact me <br /> Sincerely <br /> Larr ierino <br /> Reclamation Manager <br /> cc Bob Shukle, CDPHE-WQCD <br /> Wally Erickson, DMG <br /> Send by telecopy with confirmation original <br />
The URL can be used to link to this page
Your browser does not support the video tag.