My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-06_HYDROLOGY - M1977378 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-05-06_HYDROLOGY - M1977378 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 10:15:05 AM
Creation date
8/23/2012 7:04:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
5/6/1996
Doc Name
UIC Permitting
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment SP <br /> Page SP - 3 <br /> Pemit No.CO-0044768 <br /> Description of Project <br /> The purpose of this project will address the following: <br /> 1) Force the mine pool to physical equilibrium at an accelerated rate. <br /> 2) Force the mine pool towards chemical equilibrium from a basic pH and avoid acid conditions. <br /> 3) Speed up the chemical equilibrium process by minimizing the initial oxygen dependent reaction with metal <br /> sulfides. <br /> 4) Provide alkaline solution to counteract the initial lowering of pH in the pool as oxygen is consumed. <br /> The procedure for the project is to pump alkaline waters using either caustic soda or lydrat'd lim_e�supply <br /> alkalinity, into and through the hydraulic seal at the Terry Tunnel.Should the pool elevation raise higher than expected then <br /> the project will be moved to Sunnyside Basin and the alkaline injection will be pumped through an old ventilation raise <br /> above the 2200 ore pass. The mixture will flow into the ore pass and mix with waters that flow towards the Terry Tunnel <br /> and be diverted to the 2200 ore pass. The 2200 ore pass is connected to six different levels of the mine and is the major <br /> conduit for water to spread into the workings. See attached drawing. <br /> The schedule for pumping of alkaline waters is limited due to avalanche conditions in the winter at the Terry <br /> Tunnel(11,500'elevation)and the short summer runoff period in Sunnyside Basin,typically July and August,and because <br /> of limited access to the 12,000'plus site(elevation). At The Terry Tunnel the extended injection time will typically be from <br /> June until November.The pumping rate will be set between 600 and 1200 gallons per minute due to stream flows,will allow <br /> for 129 million plus gallons to be added per season. At Sunnyside Basin during high flow conditions approximately 12 <br /> million plus gallons of water can be added to the pool per season. <br /> Pumping could continue untiCphysical equilibrium is established. Annual evaluation will determine if continuation <br /> after the initial year is warranted. It will take an estimated 195 million, 4.UQAs QIm WwJW eqpilibn . Based on <br /> — -- — - <br /> water treatment experience,to rrLL �**■ 5-W 9.5 will require the addition of at,least 200 to of lime for quality <br /> of water at expected equilibrium. SGC would add additional lime or caustic soda to counteract acidity generated by thl -_ <br /> co=M&Wits-s�'ofVggen. <br /> -The p�je&L9711tacg�a.gl.�of approximately 9 0 to 10 0 in the pool The_infection pH will be periodically adjusted �� �v i <br /> based on bench scale testing to achieve a target injection pH level of 12.0. _ '' , Q <br /> Work 1 <br /> 1) Once the Terry Tunnel is accessible a pipe line will be strung from McCarty Creek and combined with <br /> an injection pipe to the Terry Tunnel hydraulic seal at which a one way valve will be installed.The line will <br /> be used to pump water and pH adjusting fluids through the Terry Tunnel hydraulic seal and into the orepass. <br /> 2)Pumping will be ongoing as long as there is water available and access to the Terry Tunnel is safe.The injection <br /> would be ongoing until it appears that the mine pool is reaching physical equilibrium. <br /> 3)Once the mine pool reaches equilibrium the piping will be disassembled. <br /> 4)Reclamation of the area is addressed as part of SGC's MLR Permit(M-77-378). <br /> An&sis <br /> Pumping of high pH waters with buffering capability will enhance the following aspects of the hydraulic seal <br /> project. <br /> 1)Will speed the process of achieving physical equilibrium and allow the physical system to be evaluated over <br /> a shorter time period than would occur naturally. <br />
The URL can be used to link to this page
Your browser does not support the video tag.