Laserfiche WebLink
MAYFLOWER MILL <br /> The trapezoidal flume leaKs and does not have a staff gauge. This flow <br /> measuring device does not measure to an accuracy of 10% as required by your <br /> permit and must be repaired. <br /> This is to notify you that the conditions at your Wastewater Treatment <br /> Facility as listed above constitute a violation of the Colorado Water Quality <br /> Control Act. This office must be notified in writing, within 30 days of <br /> receipt of this letter, of your course of action to bring this wastewater <br /> treatment system into compliance. Failure to notify this office within the <br /> required time limit may result in legal action. <br /> Additionally: <br /> TERRY TUNNEL <br /> Please provide us with the method you use to gain access to the Terry Tunnel <br /> during the winter months. <br /> AMERICAN TUNNEL <br /> 1. Due to the high frequency of power failures at this facility we strongly <br /> recommend that you seek a back-up power supply to insure continuous <br /> permit compliance. <br /> 2. It appears as though the settling ponds were short-circuiting at the time <br /> of my inspection. I believe that it is due to accumulated sludge and the <br /> arrangment of outfalls in the ponds. We strongly recommend that you <br /> solve these problems to facilitate compliance. <br /> 3. "Non-Potable Water" signs should be posted in showers to inform workers <br /> that they should not drink tnis water. <br /> Thank you for your time and cooperation. If you have any questions, please <br /> call me in the Grand Junction Office at 246-7154. <br /> Sincerely, <br /> James B. Horn <br /> District Engineer <br /> Water Quality Control Division <br /> JBH/m'b <br /> cc: San Juna County Sanitarian <br /> Permits & Enforcement Section, CDH <br /> Field Services, Denver <br /> EPA, Region VIII <br /> Dan Hernandes, MCR, <br /> Sharon Ferdinandsen <br /> Leslie Simpson (Inspection Report only) <br /> File <br />