Laserfiche WebLink
SUNNYSIDE GOLD CORP <br /> WATER SAMPLE ANALYSIS <br /> AMERICAN TUNNEL BULKHEAD <br /> Parameter-in units of mg/l unless noted <br /> Station i Sampldate! FieldpH Field Cond j Field7 dCd dCu `dPb dZn dFe dMn dAl ^SULFATE TOTAL HARDNESS <br /> - -- - -- ---- ---- s.u. _ umho - C --- ---- <br /> AMERICAN TUNNEL BULKHEAD 30-Mar-99 4.68 2200 97 <br /> AMERICAN TUNNEL BULKHEAD 27-Apr-99 443 2400 10.0 <br /> AMERICAN TUNNEL BULKHEAD 26-May-99 4.40 2200 14.1 <br /> AMERICAN TUNNEL BULKHEAD 25-Jun-99 462 2500 11.1 <br /> AMERICAN TUNNEL BULKHEAD 23-Jul-99 5.09 3000 12.6 <br /> AMERICAN TUNNEL BULKHEAD 24-Aug-99 485 3100 11.6 <br /> AMERICAN TUNNEL BULKHEAD 24-Sep-99 5.29 3000 11.7 <br /> AMERICAN TUNNEL BULKHEAD 22-Oct-99 484 3100 11.8 <br /> AMERICAN TUNNEL BULKHEAD 29-Nov-99 487 2600 13 <br /> AMERICAN TUNNEL BULKHEAD 28-Dec-99 488 2600 12.5 <br /> AMERICAN TUNNEL BULKHEAD 01-Jan-00 4.67 2400 11.6 <br /> AMERICAN TUNNEL BULKHEAD 25-Feb-00 488 2300 12.5 <br /> AMERICAN TUNNEL BULKHEAD 10-Apr-00 5.27 2300 17.1 0.29 024 033 258 101 316 13.6 2850 1310 <br /> AMERICAN TUNNEL BULKHEAD 10-Oct-00 5.25 2600 121 <br />