Laserfiche WebLink
Michael C. Refer 2 <br />August 14, 2012 <br />water supply plan for the pit even though the guideline referenced above is not met. All other <br />relevant aspects of the gravel pit guidelines will still be imposed on the review of the substitute <br />water supply plan. <br />The State Engineer's Office will allow this consideration for this specific set of circumstances <br />only. All other gravel pits will be subject to our application of all guidelines. <br />Sincerely, <br />cc: Joanna Williams, DWR Team Leader <br />Jonathan fternandez�DWR,_Division Engineer's Office <br />Kevin G. Rein, P.E. <br />Deputy State Engineer <br />2 <br />