Laserfiche WebLink
Scraper Worksheet Cont'd Task # C04 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />1 <br />0.830 <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Grade Roll. Res <br />( %) ( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Haul Time: <br />Total Res <br />( %) <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Team(s) Total job time: <br />$0.335 /LCY Total job cost: <br />Travel Time <br />(min) <br />Velocity (fpm) <br />0.00 <br />Velocity (fpm <br />0.00 <br />8.83 <br />$4,266.98 <br />minutes <br />minutes <br />Page 2 of 2 <br />Site Altitude: 6800 feet <br />Travel Time 1 <br />(min) <br />1.30 minutes <br />722.10 LCY /Hour <br />2 Scraper(s) <br />1,444.20 LCY/Hour <br />1,444.20 LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # C04 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />1 <br />0.830 <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Grade Roll. Res <br />( %) ( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Haul Time: <br />Total Res <br />( %) <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Team(s) Total job time: <br />$0.335 /LCY Total job cost: <br />Travel Time <br />(min) <br />Velocity (fpm) <br />0.00 <br />Velocity (fpm <br />0.00 <br />8.83 <br />$4,266.98 <br />minutes <br />minutes <br />Page 2 of 2 <br />Site Altitude: 6800 feet <br />Travel Time 1 <br />(min) <br />1.30 minutes <br />722.10 LCY /Hour <br />2 Scraper(s) <br />1,444.20 LCY/Hour <br />1,444.20 LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />