My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-20_PERMIT FILE - M2012023
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012023
>
2012-08-20_PERMIT FILE - M2012023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:33 PM
Creation date
8/22/2012 3:23:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012023
IBM Index Class Name
PERMIT FILE
Doc Date
8/20/2012
Doc Name
FINANCIAL & PERFORMANCE WARRANTY REQUEST
From
DRMS
To
TAMROCK GRAVEL
Email Name
TCW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # CO3 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: Site Altitude: 6800 feet <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />0.830 <br />Grade <br />( %) <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Roll. Res <br />( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Velocity (fpm) <br />Haul Time: 0.00 minutes <br />Total Res <br />( %) <br />Velocity (fpm) <br />Return Time: 0.00 minutes <br />Unit cost: $0.335 /LCY Total job cost: $2,133.49 <br />Page 2 of 2 <br />Travel Time <br />(min) <br />Travel Time <br />(min) J <br />Total Scraper team cycle time: 1.30 minutes <br />Adjusted for job conditions: 722.10 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,444.20 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,444.20 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.42 Hours <br />CIRCES Cost Estimating Software <br />Scra ep r <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # CO3 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: Site Altitude: 6800 feet <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />0.830 <br />Grade <br />( %) <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Roll. Res <br />( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Velocity (fpm) <br />Haul Time: 0.00 minutes <br />Total Res <br />( %) <br />Velocity (fpm) <br />Return Time: 0.00 minutes <br />Unit cost: $0.335 /LCY Total job cost: $2,133.49 <br />Page 2 of 2 <br />Travel Time <br />(min) <br />Travel Time <br />(min) J <br />Total Scraper team cycle time: 1.30 minutes <br />Adjusted for job conditions: 722.10 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,444.20 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,444.20 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.42 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.