Laserfiche WebLink
Scraper Worksheet Cont'd Task # CO3 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: Site Altitude: 6800 feet <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />0.830 <br />Grade <br />( %) <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Roll. Res <br />( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Velocity (fpm) <br />Haul Time: 0.00 minutes <br />Total Res <br />( %) <br />Velocity (fpm) <br />Return Time: 0.00 minutes <br />Unit cost: $0.335 /LCY Total job cost: $2,133.49 <br />Page 2 of 2 <br />Travel Time <br />(min) <br />Travel Time <br />(min) J <br />Total Scraper team cycle time: 1.30 minutes <br />Adjusted for job conditions: 722.10 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,444.20 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,444.20 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.42 Hours <br />CIRCES Cost Estimating Software <br />Scra ep r <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # CO3 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: Site Altitude: 6800 feet <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Return Route: <br />Seg # <br />Net Correction: <br />Haul Distance (Ft) <br />Haul Distance (Ft) <br />0.830 <br />Grade <br />( %) <br />Grade <br />( %) <br />NA <br />Roll. Res <br />( %) <br />Roll. Res <br />( %) <br />0.70 Minutes <br />0.60 Minutes <br />Total Res <br />( %) <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Velocity (fpm) <br />Haul Time: 0.00 minutes <br />Total Res <br />( %) <br />Velocity (fpm) <br />Return Time: 0.00 minutes <br />Unit cost: $0.335 /LCY Total job cost: $2,133.49 <br />Page 2 of 2 <br />Travel Time <br />(min) <br />Travel Time <br />(min) J <br />Total Scraper team cycle time: 1.30 minutes <br />Adjusted for job conditions: 722.10 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,444.20 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,444.20 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.42 Hours <br />CIRCES Cost Estimating Software <br />