My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-20_HYDROLOGY - M2003016
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2003016
>
2012-08-20_HYDROLOGY - M2003016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:32 PM
Creation date
8/22/2012 3:18:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
HYDROLOGY
Doc Date
8/20/2012
Doc Name
SUBSTITUTE WATER SUPPLY PLAN
From
OSE
To
PIONEER SAND COMPANY
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joe Kraig <br />Heit SWSP <br />August 17, 2012 <br />Page 2 of 4 <br />for the slurry wall. The remaining bond of $197,280 remains in place to cover the remainder of the <br />reclamation plan. With the slurry wall installed and approved by DWR as meeting the State <br />Engineers lining criteria for gravel pit, the Heit Mine is in compliance with the State Engineer's <br />requirements pursuant to § 37 -90- 137(11). <br />Depletions <br />You have estimated that up to 2.0 acres of ground water surface will be exposed at the Heit <br />Pit in the settling ponds. Net evaporative depletions were calculated using a gross annual <br />evaporation of 44 inches from the exposed water surface, with a credit of 9.05 inches for effective <br />precipitation. The net depletion of ground water due to evaporation from the 2.0 acres of ground <br />water exposed at the site was calculated to be 5.82 acre -feet. <br />The settling pond water is used onsite for washing aggregate and dust control. The onsite <br />production well, permit no. 66319 -F (WDID 0205038), will also be used for dust suppression and the <br />washing of mined aggregate. You have estimated that a total of 1.0 acre -foot of ground water will be <br />used for dust control purposes at the site during this plan period. You have projected washing up to <br />485,000 tons of mined aggregate a year. The annual consumptive use for aggregate washing was <br />estimated at 10.7 acre -feet using a depletion factor of 3 percent by weight. There will be no <br />concrete production at the Heit Pit during this plan period. <br />The Glover method was used with to lag evaporative and operational depletions to the South <br />Platte River. The following parameters were used in the model: transmissivity (T) = 140,000 gallons <br />per day per foot, distance (X) from the surface of the exposed ground water to the river = 2,750 feet <br />for evaporation losses and 3,000 feet for operational losses, distance (W) from the aquifer boundary <br />through the exposed ground water to the river channel = 10,000 feet, and specific yield (SY) = 0.2. <br />The location of the stream depletion is assumed to be perpendicular to the river. Lagged depletions <br />for this plan period will total 17.42 acre -feet. <br />Replacements <br />The proposed source of replacement water for the Heit Pit is a total of 20.70 acre -feet of fully <br />consumable effluent leased from the City and County of Broomfield ( "Broomfield "). Of this amount, <br />20.46 acre -feet will be used for replacement purposes under this SWSP. The existing lease was <br />extended fora one -year period beginning September 1, 2012 and ending August 31, 2013. The <br />replacement water will be released from Broomfield's wastewater treatment plant (WDID 0201021), <br />which is located on Big Dry Creek approximately 29.75 miles upstream from the Heit Sand and <br />Gravel Mine. Of the 20.46 acre -feet of leased replacement water from Broomfield, approximately <br />15% (3.04 acre -feet) will be lost during transit, based on a transit loss of 0.5% per mile for the 29.75 <br />miles from the Broomfield wastewater treatment plant to the Heit Sand and Gravel Mine. The <br />amount of Broomfield replacement water that reaches the Heit Sand and Gravel Mine is 17.42 acre - <br />feet, sufficient to cover the projected lagged evaporative and operational depletions for this plan <br />period. These transit loss amounts are subject to review and modification by the division <br />engineer or water commissioner. If a different transit loss is determined by the division engineer <br />or water commissioner the Applicant must modify their accounting and replacements, as <br />necessary, to be consistent with the determined transit loss. The monthly depletions and <br />replacement deliveries are found on the attached Table 3. <br />Conditions of Approval <br />I hereby approve the proposed substitute water supply plan in accordance with §37 -90- <br />137(11), C.R.S., subject to the following conditions: <br />1. This plan shall be valid for the period of September 1, 2012 through August 31, 2013, unless <br />otherwise revoked or modified. If this plan will not be made absolute by a water court action <br />
The URL can be used to link to this page
Your browser does not support the video tag.