Laserfiche WebLink
) <br />PHOENIX PROJECT <br />ADDITIONAL INFORMATION <br />ARCHAEOLOGY <br />Of the 14 drill sites, numbers 7, 8, and 9 are within the Nucla five -year <br />disturbance permit. The topsoil has already been removed. These <br />three sites are not included with the proposed drill plan. <br />