Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrad <br />Site: Trapper Mine <br />East Middle Z and Z3 Haul Roads <br />Permit Action: RN6 <br />Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 037 State: Colorado <br />Date: 8/9/2012 County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: COIO -037 <br />HOURLY EQUIPMENT COST <br />Source <br />Basic Machine: Cat D10T - 10SU <br />(AVG.) <br />Horsepower: 574 <br />(CAT HB) <br />Blade Type: Semi - Universal <br />(GEN.) <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />Utilization % <br />Ownership Cost/Hour: $102.22 <br />NA <br />Operating Cost/Hour: $181.78 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.49 <br />NA <br />Total unit Cost/Hour: $322.48 <br />Total Fleet Cost/Hour: $1,289.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 85,334 <br />Swell factor: 1.250 <br />Loose volume: 106,668 LCY <br />Source of estimated volume: Appendix A, Table 1.4 -5 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />80 feet <br />2.028.0 LCY /hr <br />Materials consistency description: <br />Consolidated stockpile 1.0 <br />Average push gradient: 10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />