Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 009 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.790 <br />(3 SHIFTS/DAY) <br />1.000 <br />(DOZ -OC) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.8091 <br />Adjusted unit production: 542.99 LCY /hr <br />Adjusted fleet production: 1628.97 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.702 /LCY <br />Total job time: <br />Total job cost: <br />126.47 Hours <br />$144,578.63 <br />CIRCES Cost Estimating Software <br />