My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-21_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2012-08-21_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:37 PM
Creation date
8/22/2012 7:57:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
8/21/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
RN6
Email Name
JLE
SB1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: D/E Pit Regrade (West) <br />Site: Trapper Mine Permit Action: RN6 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />Date: 8/9/2012 <br />User: JLE <br />State: Colorado <br />County: Moffat <br />Agency or organization name <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown <br />IPMENT COST <br />Cat DI 1R- IISU <br />850 <br />Semi - Universal <br />NA <br />3 per day <br />(CRG) <br />DRMS <br />Utilization % <br />Ownership Cost/Hour: $67.71 NA <br />Operating Cost/Hour: $274.62 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.74 NA <br />Total unit Cost/Hour: $381.07 <br />Total Fleet Cost/Hour: $2,286.41 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />521,710 <br />Swell factor: <br />1.000 <br />Loose volume: <br />521.710 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-5% <br />360 feet <br />845.3 LCY /hr <br />Consolidated stockpile 1.0 <br />7,000 feet <br />2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.200 <br />(S -BY -S) <br />Abbreviation: None <br />Filename: COIO -005 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.