Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Ash Disposal Pit Regrade (South and 1424160) <br />Site: Trapper Mine Permit Action: RN6 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 8/9/2012 <br />User: JLE <br />State: <br />County: <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat DIIR - IISU <br />850 <br />Semi - Universal <br />NA <br />3 Der day <br />Total unit Cost/Hour: $381.07 <br />Total Fleet Cost/Hour: $762.14 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />93,888 <br />1.000 <br />93,888 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4 -2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />265 feet <br />1,136.7 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />_ -5% <br />6,800 feet <br />2,475 lbs /LCY <br />User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.200 (S -BY -S) <br />Abbreviation: None <br />Filename: COIO -003 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$67.71 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.74 <br />NA <br />Total unit Cost/Hour: $381.07 <br />Total Fleet Cost/Hour: $762.14 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />93,888 <br />1.000 <br />93,888 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4 -2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />265 feet <br />1,136.7 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />_ -5% <br />6,800 feet <br />2,475 lbs /LCY <br />User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.200 (S -BY -S) <br />Abbreviation: None <br />Filename: COIO -003 <br />CIRCES Cost Estimating Software <br />