Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.790 <br />(3 SHIFTS/DAY) <br />1.000 <br />(DOZ -OC) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7365 <br />Adjusted unit production: <br />Adjusted fleet production: <br />837.18 LCY /hr <br />4185.9 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 5 Dozer(s) <br />Unit cost: $0.455/LCY <br />Total job time: <br />Total job cost: <br />59.27 Hours <br />$112,934.62 <br />CIRCES Cost Estimating Software <br />