Laserfiche WebLink
August 7, 2012 C-2009-087/Peabody Sage Creek Mine JDM <br /> <br /> <br /> <br /> <br />Pond 004 Repair Work <br />Pond 003 was holding water with a trickle discharge at the time of the inspection. The primary and emergency <br />spillways were stable with no problems noted. The embankments showed evidence of recent work with animal <br />burrow filling. No problems were noted during the inspection, with the exception of the following: <br />- The heavy houndstounge growth observed throughout the embankment, emergency spillway, and along the <br />outlet ditch to the flume during the July 2012 inspection has been addressed. <br />- The discharge from the pond was not flowing through the flume during the July 2012 inspection. This flume is <br />not a part of the design of the pond and PSCM personnel indicated that the flume will be removed. <br /> <br />The lower sump was holding water and discharging at the time of the inspection. The embankments were stable <br />with little to no vegetation established. The lower sump has recently been redesigned with the approval of TR4. <br />The redesign work was ongoing at the time of the inspection. No problems were noted with the exception of the <br />following: <br />- The leak of the riser upgrade has been repaired. <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br />36 <br />Page of <br /> <br /> <br />