My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-17_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-08-17_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:30 PM
Creation date
8/17/2012 1:30:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
8/17/2012
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
RN6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been placed in the eastern portion of the South Taylor pit as mining progresses westward. <br />Both the eastern and western South Taylor temporary stockpiles presented on Map 45 <br />have been completely built. Areas 2 and 3 on Figure 1 identify these stockpile areas. <br />Overburden Redistribution <br />Attached Table 1 identifies the 3 main areas of overburden redistribution which would be <br />required. Area 1 is largely a balanced cut and fill, and the required fill material to <br />reclamation of the 578 acre area would be obtained from within the boundaries of this <br />polygon. <br />To achieve reclamation of the South Taylor pit, all out of pit materials from Areas 2 and 3 <br />above the postmining surface would be hauled out of stockpile and back to the South <br />Taylor pit area. This quantity is estimated at 52,822,000 cubic yards. <br />Topsoil Redistribution <br />Attached Table 2 provides an estimate of the volumes of topsoil in stockpile as of <br />November, 2017. Volumes have first been updated from the prior annual report period, <br />and the reclamation polygons shown on Map 29 were used to redistribute topsoil from <br />the existing stockpiles. As noted, the projected volume of topsoil in stockpile as of <br />November, 2017 is approximately 3,142,000 cubic yards. <br />These figures and tables are not intended to be part of PAP and are for informational <br />purposes only. <br />If you should have any questions please feel free to contact me directly at (970) 824- <br />1532. <br />Sin cerely, <br />S no �Tony <br />Environmental Engineer <br />Encl. <br />Cc: file CF 1.1.3 <br />A Western Fuels- Colorado, LLC raining property <br />
The URL can be used to link to this page
Your browser does not support the video tag.