Laserfiche WebLink
New Elk conducted two sampling events in each month of the second <br />quarter for a total of six events. One April event was reported with the <br />enclosed first quarter DMRs, the second April event with second quarter <br />DMRs already submitted, which included two May and one June event. The <br />second June sample will be reported with the third quarter DMR's as the lab <br />had not finished the suite of analysis in time for second quarter reporting. <br />NECC has been advised that the lab we use, ACZ Labs, does not perform <br />analysis for total Coliforms. Another lab will be selected for this analysis in <br />the third and subsequent quarters. <br />To insure timely and complete reporting in the future, NECC's chief Mine <br />Engineer has assumed responsibility for permit compliance on a daily basis <br />and completing DMR's quarterly for my review and signature. <br />Please contact me if there are any questions or if additional information is <br />required. <br />Sincerely, <br />M Xny‘ <br />Ronald G. Thompson <br />General Manager <br />