Laserfiche WebLink
Permittee Contact: <br />Rick L. Hunt <br />Permittee Company: <br />Rick L Hunt <br />Address: <br />43160 County Rd 17 -21 <br />Elizabeth, CO 80107 <br />Phone Number: <br />(303) 646 -6486 <br />Fax Number: <br />(303) 646 -9233 <br />Email Address: <br />CF.PR.email <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO ", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />19. Is your basis for legal right to enter still valid? <br />20. Does your permit require you to submit monitoring information annually? <br />If "Yes ", please attach the required monitoring results to this Annual Report. <br />YES NO <br />■ <br />IV <br />YES <br />NO <br />21. As required by rule, attach a map to this report that accurately depicts the permit boundary, current affected area <br />boundary and location of the acreages specified in items 7- 12 and 14. UPDATED MAP ATTACHED: A <br />Signature of ' ermittee, Corporate Officer, Owner, or Documented Designee Date <br />g 9 -ia. <br />Page 3 of 3 <br />NO N/A <br />NO N/A <br />NO N/A <br />N/A <br />Division records indicate the following permittee contact information. If this information is not current, please type or <br />print current contact information: <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site operations are <br />being conducted in accordance . ith the Division approved mining and reclamation plans. <br />