My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-10-23_INSPECTION - M1977378
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977378
>
1985-10-23_INSPECTION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/25/2020 3:25:39 PM
Creation date
8/15/2012 12:23:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
INSPECTION
Doc Date
10/23/1985
Doc Name
Proposed Abatement Plans
From
Standard Metals Corp.
To
MLRD
Inspection Date
7/10/1985
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> November 8, 1985 <br /> NOV 14 1985 <br /> Notice of Compliance for 9' LAND <br /> Sunnyside Mine and Mayflower Mill <br /> File No. M-77-378 <br /> Cease and Desist Order No. M85-073 <br /> 1. All production related mining and mill operations have been terminated <br /> from October 23, 1985. <br /> 2. This letter will be mailed within one (1) day after receipt of the <br /> Notice. <br /> 3. The Technical Revision Stipulations that are available at this time are <br /> enclosed with this letter. <br /> 4. The Twelve Thousand Two Hundred Dollars ($12,200.00) civil penalty <br /> will be paid within 30 days of November 8, 1985. <br /> Technical Revision Stipulations <br /> 1. Updated draft copies of the mine water treatment sludge analysis for <br /> the American Tunnel.-and Terry Tunnel sites are enclosed in the letter. <br /> Upon completion of the arsenic parameter, the MLRD will receive the <br /> final analysis and laboratory analysis procedure information. <br /> 2. The permeability tests and textural classification results for Tailings <br /> Pond No. 3 are enclosed in this letter. A sampling location map will be <br /> submitted to the MLRD by November 15, 1985. <br /> 3. The flood control berm was completed on October 25, 1985. Before and <br /> after photos are enclosed with this letter. <br /> 4. Two (2) down gradient ground water monitoring wells have been constructed <br /> below the Engineer Office sludge disposal area as of November 7, 1985. <br /> Photographs of the wells, together with a location map and cross section <br /> will be submitted to the MLRD prior to December 22, 1985. <br /> 5. Certifications by a qualified professional engineer for the above mentioned <br /> flood control berm, Tailing Pond No. 3 and ground water monitoring wells <br /> will be submitted prior to December 22, 1985. <br /> 6. Groundwater sampling of the above mentioned wells will be on a quarterly <br /> basis for at least one (1) year. Upon completion of the mine water <br /> sludge analysis, parameters will be mutually agreed upon by the MLRD and <br /> the operator. Samples will be taken in accordance with EPA protocol <br /> and analyzed by an EPA certified laboratory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.