Laserfiche WebLink
Potential Sludge Disposal Sites Page 2 <br /> i <br /> 5. The final reclamation of the site by insitu burial (capping) with <br /> approximately two feet of suitable earthen material. <br /> 6. The revegetation of the entire site with the appropriate grass <br /> and forb species. <br /> Contingency: <br /> 1. To line site with bentonite clay or geo-membrane layer. <br /> 2. To relocate sludge material if necessary to more permanent <br /> disposal site. <br /> 3. To utilize the potentially active Tailings Pond No. 4 site. <br />