My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-01-04_INSPECTION - M1977378 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977378
>
1988-01-04_INSPECTION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:53:14 PM
Creation date
8/15/2012 12:18:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
INSPECTION
Doc Date
1/4/1988
Doc Name
Responses
From
Sunnyside Gold Corp.
To
MLRD
Inspection Date
10/28/1987
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> m- Z7-37J <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECHO DAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 RECEIVED <br /> AN 4. 1988 <br /> December 29 , 1987 <br /> MINED LANv <br /> Ms . Camille Farrell RECLAMATION DIVISION <br /> Colorado Department of Natural Resources <br /> Mined Land Reclamation Division Af <br /> 1313 Sherman Street <br /> Denver, Colorado 80203-2273 <br /> RE: Responses to Mined Land Reclamation Division <br /> report pertaining to inspection of 10/28/87. A/ <br /> Dear Camille: <br /> The inspection report of your October 28 , 1987 visit was <br /> received at Sunnyside Gold on November 19 , 1987. Within <br /> that report, several concerns were expressed which require <br /> responses. Each of these concerns is enumerated in the <br /> following discussion which is presented in a <br /> question/response format. Each question is fully <br /> reproduced, followed by the Sunnyside Gold Corp. (SGC) <br /> response. <br /> Question: <br /> 1. Camille Farrell met with Frank Bergstrom, Bill <br /> Goodhard, Matt Christian, Dennis Krantz and Mike <br /> Stanton to discuss the plans for possible open-pit <br /> mining development in the Sunnyside Basin (Lake Emma) . <br /> A 2-3 year operation consisting of mining two knobs <br /> utilizing Lake Emma stope as an ore chute, leaving a <br /> benched configuration with overall slopes of 2H: 1V was <br /> discussed. Soils and vegetation baseline inventories <br /> were conducted summer, 1987. <br /> Response: <br /> None required. <br /> Question: <br /> 2. The site in question was visited - the concept of open <br /> contours vs. pitting was discussed. The rocks <br />
The URL can be used to link to this page
Your browser does not support the video tag.