My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-01-04_INSPECTION - M1977378
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977378
>
1988-01-04_INSPECTION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:51:57 PM
Creation date
8/15/2012 12:17:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
INSPECTION
Doc Date
1/4/1988
Doc Name
Response
From
Sunnyside Gold Corp.
To
MLRD
Inspection Date
10/28/1987
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> tailings line. Other surface drainage from the mill <br /> site will continue to flow to the "duck pond" . <br /> Question: <br /> 7. The chemical storage building is almost complete. <br /> Interior concrete berms were not poured with the <br /> foundation. Chemicals stored (Sodium hydrosulfide, <br /> Sodium cyanide, lime, etc. ) outside on pallets in a <br /> bermed area awaiting transfer into the shed, are in a <br /> direct path of an avalanche run. These materials <br /> should be moved ASAP, especially prior to the next <br /> snowfall . <br /> Response: <br /> The newly erected reagent warehouse at the Mayflower <br /> Mill will only be used to store 50 pound bags of <br /> hydrated lime. Reagents such as Sodium cyanide and <br /> Sodium hydrosulfide are stored within the mill <br /> building. Following delivery, small quantities of <br /> these reagents may be stored outside for less than 48 <br /> hours until loader time is available to move them into <br /> the mill . This was the case during the October 28 MLRD <br /> inspection. The area in which the reagents are <br /> temporarily stored is off the north end of the <br /> facility; and it does not lie in an avalanche path, but <br /> rather to the north of one. <br /> Question: <br /> 8. Tailing Pond #1 toe adjacent to the state highway is <br /> eroding - sediment being carried into road drainage <br /> system. These areas require stabilization to minimize <br /> disturbance to the hydrologic balance. Please discuss. <br /> Response : <br /> The face of tailings pond no. 1 will be sprayed with a <br /> soil cementing agent in the spring of 1988 as soon as <br /> field conditions will allow. A test spraying of the <br /> upper surface of TP no. 1 was conducted in July 1987 <br /> with Wen-Don' s CPB-12 dust control agent. An agent <br /> with sufficient durability to require one annual <br /> treatment is being sought. This agent, once selected, <br /> will be used during the spring 1988 spraying of the <br /> outslope of TP no. 1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.