Laserfiche WebLink
Page 2 <br /> Facility Deficiencies The treatment facility needs a back-up power supply, the <br /> onds are full of sludge and are short circuting. <br /> Needed/Extra Permit Conditions Require a back-up power supply. <br /> Groundwater Impact Potential low. <br /> III. MONITORING <br /> Location and Type of Flow Measuring Equipmant Parshall Flume at discharge point 004 <br /> Accurate and Calibrated Yes. <br /> Lab doing Y DMR Analysis Intermountain Laboratories located in Farmington NM. <br /> DMR Analyses According to Approved Procedures Yes. <br /> Comments None. <br /> Cement Creek Already colored from upstream <br /> Physical Description Receiving Stream <br /> Mine drainage. <br />